Home/GPU allocation
HGX B200 · B300 · H200 · RTX PRO 6000

GPU allocation.

We supply NVIDIA GPUs and GPU servers in volume: HGX B200, B300 and H200 systems and RTX PRO 6000 cards. Each quote covers configuration, price, lead time, compliance and delivery schedule, in writing.

01 / The problem

Price isn't the hard part. Getting it is.

For current NVIDIA data center systems, the question that decides your project is when the hardware actually ships.

Source

OEM and distributor allocation

Committed supply with a real ship date, through manufacturer and distribution channels.

Source

Systems already built

Servers built for orders that fell through or changed, available ahead of a new build.

Source

Vetted secondary

Graded and tested used and refurbished GPUs and servers, when the workload allows it.

Used and secondary →
02 / How it works

From request to delivery.

Each step is in writing before the next one starts.

01/Tell us the order+

Quantity, exact configuration (GPU, CPU, memory, storage, NICs), destination, end user and the date you need it running.

02/We find the allocation+

We check OEM, distributor and built-system supply and come back with options: source type, condition, price and a real ship date for each.

03/Compliance first+

End-user details and a signed end-user statement before a PO. We screen every end user and set the export structure with a licensed exporter of record or your forwarder.

04/Hold and PO+

Once you choose, we request a hold on the units while the PO and payment terms are set.

05/Ship in tranches, or all at once+

Large orders ship on a schedule, each tranche with its own ship date. Delivered to your dock, or racked by us. See deployment.

03 / What we quote

Common allocation requests.

Starting points. Every quote is to your exact configuration.

SystemGPU memoryPower (max)
HGX B200 8-GPU servers1,440 GB per serverAbout 14.3 kW max per server
HGX B300 8-GPU servers2,304 GB per serverAbout 14 to 14.5 kW max per server
HGX H200 8-GPU servers1,128 GB per serverAbout 10.2 kW max per server
H200 NVL cards141 GB per card600 W each; about 6.2 kW for an 8-card server
RTX PRO 6000 Server Edition96 GB per card600 W each; about 6.2 kW for an 8-card server
Questions

Asked often.

What does GPU allocation mean?

Allocation is the share of a constrained product a manufacturer or distributor commits to a buyer, with a ship date. For current NVIDIA data center systems like HGX B200, B300 and H200, allocation, not price, usually decides when you get hardware.

How long are lead times on B200 and H200 servers?

It changes with supply. OEM lead times on current HGX systems have commonly run around 10 to 12 weeks or more. We quote the real lead time for your exact configuration in writing, and tell you when a faster source exists.

Do you hold inventory?

No. We find supply for each order: OEM and distributor allocation, systems already built, and vetted secondary units. Every quote states the source type, condition and ship date.

How do you handle export compliance on large orders?

We collect end-user details and a signed end-user statement before a PO, screen every end user against US restricted-party lists, and structure exports so a licensed exporter of record or the buyer's forwarder files them. Orders we can't ship lawfully we decline. See compliance.

Can you deliver in tranches?

Yes. Large orders can ship in scheduled tranches, for example a set number of servers per month, each with its own payment and ship date.

Request a quote

Request allocation.

Send the configuration, quantity, destination and date you need it. We reply with options, lead times and prices.

Not sure what's available? Free 24-hour allocation check →

sales@mulligancompute.com
(636) 248-7171
Franklin, Tennessee (Nashville)
LinkedIn →