Deployment and colocation.
From the loading dock to a running cluster. We rack it, cable it, set it up and hand it over, in your data center or in colocation we arrange.

01 / Process
What deployment covers.
Each step is on the quote with its own line.
01/Site check+
Power per rack, cooling, floor space and network handoff. GPU servers draw far more than ordinary servers; we confirm the room can take them.
02/Install+
Rack, rails, power distribution, cabling and labeling.
03/Software+
OS, drivers, CUDA, container runtime, and an inference or training stack if you want one.
04/Handover+
Documented: serials, IPs, credentials, cabling map.
Request a quote
Tell us what you need.
Part numbers, a workload, or a rough idea. We come back with options, prices and lead times, in writing.