An NVIDIA GB300 NVL72 rack costs about $4 million to $5 million for the hardware and about $5 million to $6 million deployed, based on 2026 estimates. NVIDIA publishes no list price. The best public evidence is purchase orders reported in August 2026 at just under $5.0 million without an in-rack cooling unit. The rack draws about 132 to 142 kW and needs liquid cooling.
Prices we have seen
| What | Seller or source | Price | Kind of price | Date |
|---|---|---|---|---|
| GB300 NVL72 rack, purchase-order price, no in-rack CDU | Data Gravity report | Just under $5.0M | Purchase orders | August 2026 |
| Same, with a 250 kW in-rack CDU | Data Gravity report | About $32,000 more | Purchase orders | August 2026 |
| GB300 NVL72 rack, hardware | Enzu price guide | About $4M to $5M | Estimate | September 2026 |
| GB300 NVL72 rack, deployed | Enzu price guide | About $5M to $6M | Estimate | September 2026 |
| GB300 NVL72 rack, analyst range | Loop Capital to Tom's Hardware, as collected by GPU Advisor | $3.7M to $6.5M | Analyst estimates | 2025 to 2026 |
Public prices, last checked November 23, 2026. Asking and published prices, not sold prices and not our quote.
Lead time
These racks are built and tested at the factory to order. Nobody holds them on a shelf. A maker will not give a firm ship date without a real site, because the rack needs about 132 kW and facility water, and the delivery plan depends on both.
As a monthly payment
Leased instead of bought, $4,000,000 to $5,000,000 works out to roughly $127,200 to $159,000 a month over 36 months or $99,500 to $124,400 a month over 48 months.
This is our arithmetic on one lender's published example payments (Five West Financial, checked November 2, 2026), scaled to this price. It is an estimate, not an offer. Your payment depends on your company, the term and the deal. Ask for a lease option with your quote and see how to finance AI servers.
What is in the rack
Supermicro's version, the SRS-GB300-NVL72, is a 48U rack with 72 NVIDIA B300 GPUs and 36 Grace CPUs across 18 compute trays, nine NVLink switch trays, eight 33 kW power shelves (132 kW total) and one in-rack 250 kW coolant distribution unit. Up to 21 TB of GPU memory. It is sold as one product and arrives assembled.
What the site has to supply
- Power: about 132 to 142 kW to one rack position.
- Liquid cooling: facility water to the rack, or a liquid-to-air unit sized for it.
- Floor loading and access: the rack ships full and is heavy. Check the loading dock, lifts and floor rating.
- Install and commissioning: normally priced as a separate line from the hardware.
Pick the site before you ask for a price. Without it, every number you get is a guess.
If one rack is too much
The same B300 GPUs come in 8-GPU HGX B300 servers at about $545,000 to $600,000 each. Nine of them give 72 GPUs in air-cooled 8U servers, without the rack-scale NVLink. See HGX B300 server price.
Have older servers?
H100, H200 and A100 servers you are replacing can go toward this order. See trade-in.
How to get a firm price
Every number above is a public asking or published price, with the date we saw it. None of them is our quote, and we never publish distributor or partner pricing. Your price is set per deal.
To get a firm price and delivery date we need four things: the end user's company name and website, where the hardware will be installed, the configuration and quantity, and the date you need it. Here is why. Send them on the quote page or with the one-page Quote Request Form, and we come back in writing.
We supply new systems through the official channel and built systems that already exist in the US, and quote both so you can compare the price and the date. Need to spread the cost? See how to finance AI servers.
Questions
How much does a GB300 NVL72 rack cost?
About $4 million to $5 million for the hardware and $5 million to $6 million deployed, from 2026 estimates. Purchase orders reported in August 2026 came in just under $5.0 million without an in-rack cooling unit. NVIDIA publishes no list price.
How much power does a GB300 NVL72 need?
About 132 to 142 kW per rack. Supermicro's version has eight 33 kW power shelves for 132 kW in total.
Does a GB300 NVL72 need liquid cooling?
Yes. It is a liquid-cooled rack. Supermicro's version includes one in-rack 250 kW coolant distribution unit.
Can I buy a GB300 NVL72 from stock?
No. They are built and tested to order at the factory, and the maker needs the end user and the installation site before quoting.
- Data Gravity, How much does an NVIDIA NVL72 cost?, August 2026
- Enzu, NVIDIA GB300 NVL72 price, power and specs, September 2026
- Supermicro, SuperServer SRS-GB300-NVL72, current
- GPU Advisor, GB300 NVL72 pricing, 2026
Tell us what you need.
Part numbers, a workload, or a rough idea. We come back with options, prices and lead times, in writing.